TDA is partnering with Susteon under DOE funding (DE-FOA-0002057) to develop “A High-Efficiency, Modular Pre-Combustion Capture System for Coal FIRST Poly-generation Process.” This project will demonstrate the capability of the entire warm gas cleanup and capture process, including the desulfurization system, high-temperature shift catalyst and a high-temperature trace contaminant control system. The use of warm gas cleanup will improve the process efficiency by three percentage points by selectively removing CO2 and other trace contaminants.